Location: Home > NEWS
How to maintain electroplating equipment daily
Time:2023-12-08

Electroplating equipment production lines occupy a large share in printed circuit board manufacturing enterprises. In order to ensure the normal operation of the electroplating equipment, the stability of the operation process and the service life of the electroplating equipment, the correct protection and maintenance of the equipment is very important. So, electroplating equipment manufacturers tell you why protection is important?

1. Protection and maintenance of the circulating system filter system 7d once check the filter element of the circulating system filter system to see if it leaks. Clean or replace the filter core every 10-15 days.

2. Protection of the linear plating line and protection of the linear plating line use brackets and expanders to transfer the substrate. Clean the crane and spanners once a week (do not remove the car and spanners), adhere to the clean appearance, clean with a rag, and sand with sandpaper.

3. Protection and maintenance of conveyors in horizontal electroplating production lines The conveying equipment used in horizontal electroplating production lines is the drum, which uses the rotation of the drum to continuously feed the circuit board into each slot. Therefore, the protection of the transport equipment of the horizontal hanging plating production line is different from that of the linear plating production line.

The drums of the horizontal plating line should be sorted once for 7 days to remove dirt adhering to the drums and ensure that the surface of the conveyor plate is clean. Check that the crankshaft is down.

4. The protection and maintenance of the vibration tissue on the linear electroplating production line should be carried out on the linear electroplating. In order to ensure the uniformity of the exterior copper and the effect of the hole copper during the copper plating process, the plate will vibrate and shake, and the tank will be set to vibrate and shake the structure. Check the reducer for 30 days to see if it works normally and check its tightness; Check the fastening of the bolts installed on the motor; Check the wear of anti-vibration rubber and replace it in time if it is serious. Check the contact of power cables in the 180d junction box. When the terminal is loose, tighten it immediately. For power cables with melted or aged insulation layers, replace the power cables to ensure insulation between them.

5. Protection and maintenance of other parts 7d. It is necessary to check the output power of the power supply twice; Check the heat dissipation devices and radiators commonly used in power supplies and electrical control devices, remove dust, and clean them to prevent heat dissipation. Check all connectors, timely repair poor contact, virtual connection and virtual welding, and timely replacement in case of corrosion damage; Check all contactors and relays. If the contact is poor or stuck, please replace it in time; Check the main parameters of capacitors, reactors, resistors and other parts. If abnormal, replace as soon as possible.

6. The main difference between the protection of the storage tank and the straight plating line and the horizontal plating line is that the method of transporting the circuit board is different. Tank protection and protection methods actually vary greatly. Within 7 days, each cleaning tank should be cleaned once, and the acid cleaning tank should be cleaned once, and then the tank liquid should be removed and replaced. Check whether the automatic water spraying device in the storage tank is blocked and pass the blockage immediately.

For the conductive support on the copper and tin plating solution and the contact between the anode and the induction power transmission line, wipe once with a towel and sandpaper. Check the titanium and tin baskets of the copper plating tank and tin plating tank, replace the rotten titanium basket bags and tin baskets, add the copper ball and tin rod, add the copper ball and tin rod after 7 days, electrolytic copper plating tank and electroplating tin bath.

主站蜘蛛池模板: 内地av在线| 亚洲在线不卡 | 私色综合网 | 国产精品拍天天在线 | 艳妇接受性按摩av | 人人澡超碰碰一区二区三区不卡 | 亚洲伊人色欲综合网 | 国产精品久久久久9999赢消 | 亚洲欧美视频在线播放 | 男人午夜av | 欧美丰满老熟妇aaaa片 | 久久精品99国产精品 | 国产成人精品一区二区三 | 日韩精品综合网 | 久草色站 | 国产日韩精品一区二区 | 国产免费牲交视频网站 | 人人艹人人爱 | 想看黄色一级片 | 2019日韩中文字幕 | 中文字幕一区二区人妻性色 | 国产在线一区二区三区在线 | 国产极品视觉盛宴 | 综合国产 | 久久99精品久久久久久国产越南 | 少妇一级淫片 | 欧美无人区码卡二卡3卡4破解 | 中文字幕第二十一页 | 日本中文字幕免费在线观看 | 亚洲性视屏 | 亚洲妇熟XXXX妇色黄 | 射婷婷 | 久久久久久久久久久美女 | 超清无码不卡毛片 | 精品亚洲成a人片在线观看 久久九九免费 | 日韩一区二区免费看 | 玩麻豆国产?片对白日逼视频 | 2020精品国产福利在线观看香蕉 | 一区二区精品区 | 国产精品18久久久久久久久 | 国产清纯美女白浆在线播放 |